{"id":11281,"date":"2026-11-26T10:34:41","date_gmt":"2026-11-26T18:34:41","guid":{"rendered":"https:\/\/fursone.com\/carbon-per-metre-declared-unit-boundary\/"},"modified":"2026-11-26T10:34:44","modified_gmt":"2026-11-26T18:34:44","slug":"carbon-per-metre-declared-unit-boundary","status":"publish","type":"post","link":"https:\/\/fursone.com\/nl\/carbon-per-metre-declared-unit-boundary\/","title":{"rendered":"Carbon per Metre: What Must the Figure Declare?"},"content":{"rendered":"<p>A carbon figure per metre is a converted number, and the conversion is the part a buyer has to be able to read. Three documents sit behind such a figure: a site average, a product-level carbon footprint, and a published environmental product declaration. Each answers a different question. None of the three quantifies a metre, so a per-metre value exists only after a mass per metre and a width have been fixed and written down. Before the figure travels to an EU stockist, the declaration has to carry the declared unit with the conversion basis, the stages inside the boundary, the data year, whether the number was measured or taken from a database factor, and who calculated the number. A declaration is a paper before it is a number, and <a href=\"\/nl\/azo-svhc-declaration-vs-test-report-eu-file\/\">Azo and SVHC on One Sheet: Letter or Lab Report?<\/a> tests that for a dyehouse claim. A figure missing any of those five is not a smaller claim. It is a claim the buyer cannot pass on.<\/p>\n<h2>Three documents hide behind a carbon figure per metre<\/h2>\n<p>This question was not put to any model in this run. No answer exists from ChatGPT, Claude, Gemini or Perplexity for the question. Every sentence below comes from three documents: the <a href=\"https:\/\/ghgprotocol.org\/product-standard\" target=\"_blank\" rel=\"noopener\">GHG Protocol Product Standard<\/a> page, the ISO 14067:2018 catalogue page, and the International EPD System\u2019s PCR library.<\/p>\n<p>Three objects sit behind one request. A site average is one figure for a whole mill\u2019s output, divided across everything the mill makes. A product-level carbon footprint is a figure for one product across a life cycle, calculated inside a stated boundary. An environmental product declaration is a published document, checked by an independent verifier, and built on a product category rule. The three are not interchangeable. For example, a site average cannot answer a question about one cloth, and a declaration for one cloth cannot describe a mill. First, ask which of the three is on the table. Second, ask who calculated the number and against which rule.<\/p>\n<h2>Why is a carbon figure per metre a converted unit?<\/h2>\n<p>All three documents quantify a product across a life cycle. A metre carries no mass, so no document quantifies a metre. The per-metre figure appears only after two quantities are fixed. Step 1 is mass per metre. Step 2 is the width over which the mass is measured. Change the width basis and the same cloth yields a second honest per-metre value. For example, a figure declared on cuttable width and a figure declared on loom width are both true and are not the same number.<\/p>\n<p>The conversion travels with the figure or the figure is useless. Write the declared unit as a mass over a stated length at a stated width, name the method used to obtain the mass, and state whether the mass was weighed or read from a specification. According to ISO 14067:2018, a partial footprint is quantified consistently with the ISO 14040 and ISO 14044 life-cycle series, and those series quantify a product system rather than a length of cloth.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/fursone.com\/wp-content\/uploads\/2026\/09\/%E5%BE%AE%E4%BF%A1%E5%9B%BE%E7%89%87_20260908094425_85_4-rotated.jpg\" alt=\"A plain wool swatch squared on a cutting table beside a steel rule and a small balance, set up to convert a length of cloth into a mass\"><\/p>\n<h2>Where does the boundary stop, and why is the word partial compulsory?<\/h2>\n<p>A boundary is the list of stages included in a calculation, and the list belongs next to the figure. The GHG Protocol Product Standard page describes the full life cycle as raw materials, manufacturing, transportation, storage, use and disposal. A weaving mill measures a smaller set: electricity and fuel at the mill, fibre purchased, and yarn transport to the door. Everything downstream of the mill gate sits outside a mill\u2019s own measurement.<\/p>\n<p><a href=\"https:\/\/www.iso.org\/standard\/71206.html\" target=\"_blank\" rel=\"noopener\">ISO 14067:2018<\/a> provides for a partial carbon footprint of products, quantified over a stated subset of the life cycle. That provision makes a mill figure legitimate as a document, and the same provision makes the word partial compulsory on the page. Write the boundary as two lists, stages inside and stages outside. A dyehouse sits on the boundary, and <a href=\"\/nl\/chemical-management-clause-evidence-dyehouse-scope\/\">Chemical Management: Which Clause Needs Which Paper?<\/a> asks the same boundary question. Name the largest excluded stage in the same sentence, because a stockist looks for the exclusion before reading anything else.<\/p>\n<h2>What was measured, and what is a database factor?<\/h2>\n<p>A measured figure comes from the mill\u2019s own records, and a factored figure comes from a secondary database, and the declaration has to say which is which. Electricity and fuel arrive as meter readings and supplier invoices. Fibre arrives as a purchased mass on a supplier document. Those readings are measurements. Anything the mill never saw becomes a factor taken from a published database.<\/p>\n<p>The two sources do not carry equal weight, and the difference belongs on the page. A database factor labelled \u201cwool fabric\u201d describes an average across many producers, many widths and many processes, so a factor cannot stand in for one mill\u2019s cloth. When part of a calculation rests on a factor, write one sentence: estimated, from which database, for which data year, covering which stages. For example, mill stages measured from invoices and dyeing estimated from a published factor for the stated year. That sentence costs one line and stops a partly measured figure being read as measured throughout.<\/p>\n<h2>Why can two mills not be compared on a per-metre figure?<\/h2>\n<p>Comparison is a property of two figures made under one shared product rule, and the three sources read for this piece withhold such a rule. According to the FAQ on the GHG Protocol Product Standard page, industries will build product rules from the standard before products can be compared, and until then the stated benefits are identifying hot spots and concentrating resources. The same page records a joint working group with ISO announced in February 2026 to develop a harmonised product-level standard.<\/p>\n<p>ISO 14067:2018 addresses a single impact category, climate change. One category cannot rank two mills on any other ground. A mill\u2019s own calculation carries no product rule at all, so a per-metre figure from a mill can inform a purchasing decision and cannot rank two mills against each other. Ranking arrives when both numbers were produced under one shared rule, and no rule was shared in the request that opened this page.<\/p>\n<h2>What does verification add, and what is the word verified not?<\/h2>\n<p>Verification is an independent check of a calculation against a written rule, and a supplier\u2019s own arithmetic is not verification. The International EPD System describes an environmental product declaration as a published document carrying verified information, and a product category rule as the instruction set for conducting the life-cycle assessment. Those two objects let a stranger read a published declaration without meeting the mill.<\/p>\n<p>Volgens het <a href=\"https:\/\/www.environdec.com\/pcr-library\" target=\"_blank\" rel=\"noopener\">PCR library page<\/a>, every rule carries a status: registered, under development, or expired. That status is the quiet point of this section. A verified figure has a date on the rule as well as a date on the data, and a rule can expire while a document stays in circulation. Check both dates. An expired rule does not make a calculation dishonest, and a stale rule does change what a reader may assume about the method behind the number. For example, a certificate reaches no further than its scope, as <a href=\"\/nl\/certificate-coverage-shade-check-before-bulk-dye\/\">OEKO-TEX Covers the Cloth, Not Always Your Shade<\/a> sets out.<\/p>\n<h2>Who owns the sentence when the figure is passed on?<\/h2>\n<p>The sentence that carries a figure changes owner at every handover, and the last owner is the one a stockist reads. A mill calculates and writes a declaration for the cloth supplied. A brand passes the declaration to a stockist, and a stockist may put the figure into a tender or a label. ISO 14067:2018 places communication of carbon footprint information outside its own scope, so a mill\u2019s calculation does not by itself authorise a published claim. The person publishing carries the published sentence.<\/p>\n<p>Write the responsibility line where the handover happens. One sentence names the calculator, the document version and the permitted use, from internal sourcing only to a named customer file. A second sentence names who may publish. Keep both short, place both on the declaration, and reissue both when the data year changes rather than editing a copy already in circulation. For example, a tender line that names the cloth but not the data year leaves a stockist unable to date the number.<\/p>\n<h2>Which eight questions must the figure answer?<\/h2>\n<p>Eight questions test whether a declaration can be passed on, and none of the eight is a field any standard mandates. The list is a buyer\u2019s checklist, not a compliance test, and this article says so where the list appears.<\/p>\n<p>1) What is the declared unit, and which conversion produced the number? 2) Which stages sit inside the boundary, and which are excluded? 3) What is the data year? 4) Which parts are measured, and which are factored, from which database? 5) Which method and which version were used? 6) Which allocation rule divided shared mill services? 7) Who calculated the figure, and who checked the arithmetic? 8) What is the verification status, and what use is permitted?<\/p>\n<p>Ask the eight in writing and keep the answers beside the declaration. A supplier who can answer seven and not the eighth has told a buyer something useful about the document.<\/p>\n<h2>The eight fields, and what this page will not do<\/h2>\n<p>The eight fields below turn the questions from the previous section into a ledger a buyer can print, complete and hand back with the declaration. An unanswered field is not a reason to refuse a document. An unanswered field is a reason to write down why the answer is missing, in the buyer\u2019s own file, beside the version number of the declaration.<\/p>\n<p>In practice, two fields are left blank more often than the rest: the data year and the allocation rule. Both live inside the mill\u2019s records rather than in the document sent out, so both need asking for by name. For example, a declaration naming a calculation method but not a method version leaves a reader unable to reproduce the arithmetic. Fill the ledger once per document version, keep the completed copy with the purchase file, and reissue the ledger when the data year changes.<\/p>\n<h3>The eight fields in one table<\/h3>\n<p>One row per field, with the question the field answers and the sentence to write when no answer exists.<\/p>\n<table>\n<thead>\n<tr>\n<th>Veld<\/th>\n<th>Question the field answers<\/th>\n<th>Where it can come from<\/th>\n<th>What to write when it cannot be answered<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Declared unit<\/td>\n<td>Mass over what length, at what width<\/td>\n<td>Mill specification and weighing record<\/td>\n<td>Conversion basis not stated; no basis for lining up with another figure<\/td>\n<\/tr>\n<tr>\n<td>Boundary<\/td>\n<td>Which stages inside, which stages outside<\/td>\n<td>Mill energy records and supplier documents<\/td>\n<td>Largest excluded stage named in the same line<\/td>\n<\/tr>\n<tr>\n<td>Data year<\/td>\n<td>Which year the figures describe<\/td>\n<td>Invoices and meter logs<\/td>\n<td>Year not stated; document dated by issue date only<\/td>\n<\/tr>\n<tr>\n<td>Data source<\/td>\n<td>Measured or factored, and from which database<\/td>\n<td>Invoices and a database reference<\/td>\n<td>Estimated share stated stage by stage<\/td>\n<\/tr>\n<tr>\n<td>Method and version<\/td>\n<td>Which rules produced the arithmetic<\/td>\n<td>Calculation file<\/td>\n<td>Method version not recorded; figure not reproducible<\/td>\n<\/tr>\n<tr>\n<td>Allocation rule<\/td>\n<td>How shared mill services were divided<\/td>\n<td>Calculation file<\/td>\n<td>Allocation not stated; shared stages left unassigned<\/td>\n<\/tr>\n<tr>\n<td>Calculator<\/td>\n<td>Who ran the calculation<\/td>\n<td>Named author at the mill<\/td>\n<td>Author unnamed; treat as an internal supplier statement<\/td>\n<\/tr>\n<tr>\n<td>Verification<\/td>\n<td>Checked by whom, and what use is permitted<\/td>\n<td>Verification statement<\/td>\n<td>No verifier; internal sourcing only<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>What this page will not do<\/h3>\n<p>The page prints no carbon figure, for one cloth or for a mill average, and passes no view on how a standard applies to a given document. A judgement needs the calculation in front of the reader, and the calculation was never on this page. The piece advises nothing about offsetting either, because ISO 14067:2018 places offsetting outside its own scope, and a declaration should not imply otherwise.<\/p>\n<p>What the page does say is narrower. A per-metre figure is a conversion, and the conversion basis, the boundary, the data year, the data source, the method, the allocation rule, the calculator and the verification status have to travel with the number. Traceability files already run on tiers of proof, as <a href=\"\/nl\/signed-labour-statement-wool-traceability-tiers\/\">Is a Signed Labour Statement Enough for a Wool File?<\/a> shows. Ask for the eight fields in writing, then decide in the buying file whether the document is good enough to pass to a stockist. That decision belongs to the buyer.<\/p>","protected":false},"excerpt":{"rendered":"<p>A carbon figure per metre is a converted number, and the conversion is the part a buyer has to be able to read. Three documents sit behind such a figure: a site average, a product-level carbon footprint, and a published environmental product declaration. Each answers a different question. None of the three quantifies a metre, &#8230; <a title=\"Carbon per Metre: What Must the Figure Declare?\" class=\"read-more\" href=\"https:\/\/fursone.com\/nl\/carbon-per-metre-declared-unit-boundary\/\" aria-label=\"Lees meer over Carbon per Metre: What Must the Figure Declare?\">Lees verder<\/a><\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rank_math_title":"","rank_math_description":"","rank_math_focus_keyword":"","rank_math_robots":"","rank_math_canonical_url":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_twitter_title":"","rank_math_twitter_description":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"A per-metre carbon figure is a conversion. What the declaration must state, and the eight fields to ask for before passing it to a stockist.","_yoast_wpseo_focuskw":"carbon footprint per metre","_yoast_wpseo_canonical":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_robots_default":"","_aioseo_robots_noindex":"","_aioseo_og_title":"","_aioseo_og_description":"","_aioseo_twitter_title":"","_aioseo_twitter_description":"","aiosp_title":"","aiosp_description":"","aiosp_keywords":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_analysis_target_kw":"","_seopress_robots_canonical":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_genesis_title":"","_genesis_description":"","_genesis_canonical":"","_genesis_noindex":"","_genesis_nofollow":"","slim_seo":"","footnotes":""},"categories":[315,311],"tags":[],"class_list":["post-11281","post","type-post","status-publish","format-standard","hentry","category-cost-logistics","category-fabric-knowledge"],"_links":{"self":[{"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/posts\/11281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/comments?post=11281"}],"version-history":[{"count":1,"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/posts\/11281\/revisions"}],"predecessor-version":[{"id":11282,"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/posts\/11281\/revisions\/11282"}],"wp:attachment":[{"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/media?parent=11281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/categories?post=11281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fursone.com\/nl\/wp-json\/wp\/v2\/tags?post=11281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}