Two four-point reports on one roll of wool coating can both be correct and still disagree. A four-point report is a sheet of penalty points, and the sheet is not a verdict on the roll. Neither document governs by default. A purchase order silent on the method, the edition, the point option, the limit with its unit and scope, and the width basis leaves a buyer holding two opinions and no tiebreaker. Before anyone names a referee laboratory, align four fields against both reports: the point option, the edition, the limit with its unit and scope, and the width basis. Most reported conflicts end at the alignment, because the two papers were answering two different questions about one piece of cloth. The residue is a real difference, and according to ASTM D5430-26 the method itself says how to test one. First align the paper, then argue about the number.

Whose Number Decides When the Mill Passes and Your Inspector Fails?

A four-point report is a record of visually graded defects on a length of cloth, and the record is not a verdict on the roll. Neither the mill’s report nor the buyer’s inspection report decides the outcome unless the purchase order or the supply contract says which one does. According to ASTM D5430-26, the method is “considered satisfactory for acceptance testing a commercial shipment” because the trade has used it extensively, and Scope 1.2 limits the use to cases where purchaser and seller agree. Agreement is the operative word.

In practice, the two documents in a buyer’s hand answer different questions. One states whether a single roll passes a per-roll limit, the other whether a shipment passes an average. Start from the paper, not from the number. The four alignment checks decide whether a conflict exists at all.

Were the Two Numbers Even the Same Measurement?

Which Point Option Was Each Report Using?

A point option is the rule a grader applies when assigning penalty points to a fault, and ASTM D5430-26 lists more than one option. Significance and Use 5.2 states the consequence: penalty points for the same rolls “may vary considerably when using each of the options listed herein”. The standard then gives the instruction which settles most disputes. The same point assignment option “should be used in cases of disagreement arising from differences of values reported by the purchaser and the supplier”. Two graders working under different options disagree about the rule, not about the cloth.

First, read both reports and find the option each one names. Second, treat a report naming no option as incomparable, because nobody can re-grade a number without knowing the rule behind the number. For example, an inspector’s sheet citing the method but not the option has recorded a score with no key.

Which Edition, Unit and Width Basis Was Each Report Reading?

An edition is the dated version of the standard a report is graded to. A width basis is the line on the cloth from which the graded width is taken. Both change the number without changing the cloth. The current edition is ASTM D5430-26. Earlier editions such as D5430-13 (reapproved 2017) are still named in many contracts, according to Clear To Load’s inspection guide read in 2026. Two reports graded to two editions are two different documents.

The unit matters next: metric and imperial rates are not the same number, so the limit needs a unit beside the figure. The width basis matters last, because cuttable width is narrower than full width and gives a slightly higher score for the same faults. First check the edition, second the unit, third the width basis. A pair of reports disagreeing on all three has not yet disagreed about fabric.

Does the Score Cover What Your Inspector Failed the Roll For?

A four-point score is a total of penalty points for visible defects. The score covers appearance only, and a roll can fail on a property never measured. Shade, width, weight, bow and skew are checked and reported separately from the defect score, according to Clear To Load’s inspection guide read in 2026. A buyer’s inspector who fails a roll for a shade bar, for weight per square metre, or for weft distortion is not contradicting a passing score. The inspector is reporting a property outside the method’s scope, and the two documents are not in conflict at all.

The remedy is a specification row, not a referee laboratory. Write the shade tolerance, the width, the weight and the skew limit into the order as separate acceptance criteria, each with a unit and a test method. First separate the two kinds of failure, then argue about the number. For example, a roll rejected on shade needs a colour standard and a lighting condition, and no defect score supplies either.

Per Roll or Per Lot: Can One Roll Fail While the Shipment Passes?

The scope of a limit is the unit the limit applies to, either the individual roll or the shipment as a whole. ASTM D5430-26 supplies the method and not the scope. According to Clear To Load’s guide read in 2026, “The limit, and whether it applies per roll or per shipment, must be in your contract.” A per-roll limit and a shipment average can give opposite verdicts on the same roll, and both calculations can be correct. Scope 1.2 of the standard allows acceptance of individual rolls and of shipments when purchaser and seller agree, which is why one method supports two documents.

This is the commonest false conflict in a buyer’s file. First, ask which unit each report states. Second, ask whether the failing roll sits inside a passing average. Third, write both lines into the order if both matter. The ten-roll lot-fail decision at goods-in is a separate step, covered in the lot-fail line on ten rolls.

Where Do the Five Divergences Come From?

What Do the Two Reports Have to Be Checked Against?

A divergence is a difference between two graded numbers, and only five causes produce one. The table sorts the five. First, work down the rows in order. An earlier row explains a later one. According to Clear To Load’s inspection guide read in 2026, the limit and its scope sit in the contract, not in the method. For example, a report cleared on option and edition can still fail on the unit.

Divergence What to check in both reports What the order must name Who has to fix it
Point option the option each report names one option for both graders both parties, by re-grading
Edition the edition printed on each report the edition, ASTM D5430-26 buyer, in the order
Unit of the limit metric or imperial rate the unit beside the figure buyer, in the order
Scope of the limit per roll or shipment average the scope, roll or lot buyer and mill, jointly
Width basis full width or cuttable width the width basis buyer, in the order
Property outside the score shade, width, weight, bow, skew a separate specification row buyer, by specification

A pair of reports clearing every row has a real difference on its hands. No amount of re-reading settles the difference. The next section sets out what the method asks for at that point.

What Does the Table Not Settle?

A residual difference is a gap between two numbers after both reports share the same option, edition, unit, scope and width basis. Two causes remain: sampling of the piece, and grading judgement at the edge of a fault. Neither cause is settled by reading the reports again, and both are what the standard’s bias clause exists to test. A third laboratory’s number is not a tiebreaker, because a third number adds an opinion rather than a comparison.

The table also cannot fix a document which omitted a field in the first place. A mill’s internal quality code is not a specification, which is the point of the Quality 6501 comparison. An inspector’s sheet without a cited option is not a measurement, and a supplier declaration is not a test report, as the azo and SVHC file shows. First repair the documents, then test the numbers.

When the Difference Is Real, What Does the Method Ask For?

A bias test is a comparison run to establish whether two laboratories differ systematically, and ASTM D5430-26 prescribes one in Significance and Use 5.3. Significant differences reported by laboratories call for comparative tests to determine whether a statistical bias exists between them, with competent statistical assistance. The samples must be as homogeneous as possible, drawn from the material which produced the disparate results, and randomly assigned in equal numbers to each laboratory. Results are compared using a statistical test for unpaired data, at a probability level chosen before the testing series.

Three requirements follow for the order: how many specimens each laboratory receives, who prepares and codes the portions, and the decision rule fixed in writing before the first test. A single referee result cannot detect bias between two laboratories. A third opinion is not the test the method describes.

What Must the Order Name Before the Roll Is Cut?

Which Clauses Belong in the Order?

An order clause is the writing which makes a number decidable, and the order needs six of them. First, name the standard and the edition, in the words printed on the reports. Second, name the point option both graders must use. Third, state the limit with its unit and scope, per roll or shipment average. Fourth, name the width basis, full width or cuttable width. Fifth, name the referee laboratory now, not during the dispute. Sixth, require the sample to be split at the joint inspection into three separately sealed portions, with unique seal numbers on the inspection record and one portion in neutral custody.

Portions are split at the inspection, never pulled after either number is known. A notified dispute must freeze disposal, or a portion can be discarded while the dispute is live, according to SBS Trading’s retained-sample note read in 2026. Match the identifiers to the roll ticket and the invoice line; a priced line records a transaction, not a composition, as the composition file explains.

Who Pays, Who Freezes the Roll, and How Far Does the Result Reach?

Cost allocation in a referee clause is enforceable only when losing is defined. Commonly the losing party pays, and “losing” has to be expressed as a deviation from the contract specification, not from either side’s certificate, according to SBS Trading’s note read in 2026. A certificate-against-certificate test re-runs the original argument one level up. Cap the remit as well: one umpire analysis on the sealed portion, with no second round of laboratories.

The result’s reach needs a sentence. State whether the referee finding binds the tested roll only, the dye lot, or the whole shipment. A portion cut from one length cannot testify for a lot the portion does not represent. The portion split is a commodity drafting convention; a roll of cloth is not a bulk consignment, because a defect has a position along a length. The roll stays in the buyer’s custody during the dispute, the neutral holder keeps the sealed portion, and neither party cuts the cloth.

What Do You Do With the Roll This Week?

A quarantine is a hold placed on the roll while two numbers disagree, and the roll should not be cut during the hold. First, move the roll to a separate location, tag the roll with the number on the ticket, and photograph the ticket beside the cloth. Second, ask both graders to re-grade the same piece under one named option, and record the option on both sheets. Third, keep both reports with the seal numbers, because a later referee result has to be matched to the portions the seals identify. Fourth, write the clause set before the next roll ships, since the current dispute cannot be drafted away.

For example, a buyer holding a quarantined roll and two reports has everything needed to settle the present question, and nothing yet in place to avoid the next one.

Grey wool coating on a mill table with a numbered roll ticket beside two printed inspection reports, one marked pass and one marked fail

Delia

Lämna en kommentar

Tillbaka till toppen
Behöver du en snabb offert? Chatt med vårt exportteam på WhatsApp.